Why
This project includes a lot of confidentility. The main goal was to integrate a laboratory device in a real time envrionment.
How
We studied all the project, with a lot of specification. These specification was co-validated by us and the customer. After this step, we integrate the device with a lot of testing phases .
What
The project was delivered in time, in c#, and the client sold the solution.