![](/web/image/11005-8291c189/why.png)
Why
This project includes a lot of confidentility. The main goal was to integrate a laboratory device in a real time envrionment.
How
![](/web/image/11006-b9f9a55f/how.png)
We studied all the project, with a lot of specification. These specification was co-validated by us and the customer. After this step, we integrate the device with a lot of testing phases .
![](/web/image/11003-cbce36a3/what.png)
What
The project was delivered in time, in c#, and the client sold the solution.
![](/web/image/11004-fafc51ce/shutterstock_302406578.png?access_token=b7c38be4-7204-4d77-84bc-8113169a2f9d)